Prix du XXe siècle | Institut royal d'architecture du Canada

Prix du XXe siècle

The Royal Architectural Institute of Canada and the National Trust for Canada wish to promote public awareness about significant Canadian architecture of the 20th century.

The Prix du XXe siècle recognizes outstanding and lasting contributions to Canadian architecture, and landmark buildings in the historical context of Canadian Architecture. This prize celebrates design quality as well as enduring excellence, recognizing buildings that continue to be used as designed or that have successfully accommodated new uses without being altered in ways that detract from the original design intent. The award can recognize a building in Canada, designed by an architect from any country, or a building anywhere in the world that was designed by a Canadian architect.

2020
Recipient(s) Architect(s)
Niagara Falls Butterfly Conservatory

Baird Sampson Neuert Architects

View
Humber Bicycle and Pedestrian Bridge

Montgomery Sisam Architects

View
2019
Recipient(s) Architect(s)
Royal Manitoba Theatre Centre View
2017
Recipient(s) Architect(s)
CN Tower

John Andrews International/Roger du Toit

The Webb Zerafa Menkes Housden Partnership (WZMH)

Associated Project Architect, Edward R. Baldwin

View
Ontario Place - Cinesphere and Pods
Eberhard Zeidler (then of Craig Zeidler Strong, now Zeidler Partnership Architects)
 
View
2018
Recipient(s) Architect(s)
Toronto Central YMCA

Diamond Schmitt Architects

View
2014
Recipient(s) Architect(s)
Strutt House (1956)

James W. Strutt

View
Toronto City Hall and Nathan Phillips Square (1965)

Viljo Revell and John. B. Parkin Associates
(now NORR Limited Architects Engineers Planners) 

View
2007
Recipient(s) Architect(s)
Smith House 2 (1964)

Erickson/Massey

View
The Toronto Dominion Centre - 1967 (First phase); 1991 (Sixth phase)

Toronto Dominion Bank Tower, Royal Trust Tower, Commercial Union Tower (now called Canadian Pacific Tower), and Banking Hall
Architects: Bregman + Hamann Architects and John B. Parkin Associates (in joint venture)
Design consultant: Ludwig Mies van der Rohe

IBM Tower (now called TD Waterhouse Tower)
Architect: Bregman + Hamann Architects

Ernst & Young Tower
Architects: Bregman + Hamann Architects and Scott Associates (in joint venture)

View
Habitat '67 (1967)

Moshe Safdie, FRAIC, and David, Barott, Boulva, Associated Architects

View
Wolf House (1967)

Diamond & Myers (designed by Barton Myers)

View
Simon Fraser University (1965)

Erickson/Massey

View
2012
Recipient(s) Architect(s)
Peter Hemingway Fitness and Leisure Centre (1969-70)

Hemingway and Laubenthal Architects

View
2011
Recipient(s) Architect(s)
The Museum of Anthropology at UBC (1971-76)

Arthur Erickson Architects

View
Heating and Cooling Plant, University of Regina (1967)

Clifford Wiens

View
Ottawa Train Station (1966)

John B. Parkin Architects (Successor Firm, NORR Limited) 

View
2013
Recipient(s) Architect(s)
Massey College (1962)

Ron Thom (with Thompson, Berwick & Pratt)

View
Grande Prairie Regional College (1974)

Douglas Cardinal, FRAIC

View
2015
Recipient(s) Architect(s)
Fathers of Confederation Buildings Trust (Confederation Centre of the Arts) (1964)

Affleck, Desbarats, Dimakopoulos, Lebensold, Sise
(later ARCOP, now Architecture | 49)

View

Pages